Artemis I Stacks Up | Watts Up With That?

From NASA

Nov. 24, 2020

The primary of 10 items of the dual House Launch System (SLS) rocket boosters for NASA’s Artemis I mission was positioned on the cellular launcher Saturday, Nov. 21, 2020, contained in the Automobile Meeting Constructing (VAB) at NASA’s Kennedy House Middle in Florida. Engineers used considered one of 5 overhead cranes to elevate the section from the VAB’s Excessive Bay four to the newly renovated Excessive Bay three. The part is the underside part of the booster, often called the aft meeting, which home the system that controls 70% of the steering through the rocket’s preliminary ascent. Over a number of weeks, the opposite segments shall be stacked separately and topped with the ahead meeting.

Launching in 2021, Artemis I shall be an uncrewed take a look at of the Orion spacecraft and SLS rocket as an built-in system forward of crewed flights to the Moon. Underneath the Artemis program, NASA goals to land the primary girl and the following man on the Moon in 2024 and set up sustainable lunar exploration by the tip of the last decade.

Picture Credit score: NASA/Cory HustonFinal Up to date: Nov. 24, 2020Editor: Yvette Smith

November 27, 2020 in NASA. Tags: Artemis, Artemis I, People in House

You May Also Like

Leave a Reply

Your email address will not be published. Required fields are marked *